PacifiCorp Oneida Project
About The Project
Customer: PacifiCorp
- Location: Preston, Idaho
- Project: PacifiCorp Oneida Intake Improvement
- Lemke Industrial Machine LLC: Provided a Torque Tube design gate hoist with 220,000 lbs. lift capacity at 3 fpm. The hoist utilized 6 to 1 block and tackle system and had a large disk brake. The control system provided by Lemke allowed for local and remote control of the hoist.
REACH US AT
715.842.3221
ADDRESS
143454 County Hwy NN
Marathon, WI 54448
Why Choose Lemke?
Over 45 years of experience
Since 1973
Lemke is recognized with a wide range of certifications and memberships.
View our designations, NAICS codes, certifications, and memberships.
Engineer and fabrication abilities on site
We are uniquely qualified to design, engineer, fabricate, assemble, and test virtually every size, style and configuration of dam gate hoist.