Alliant Energy – Prairie du Sac Dam2019-06-25T16:44:11+00:00

Alliant Energy – Prairie du Sac Dam

About The Project

  • Customer: Alliant Energy

  • Location: Prairie du Sac, WI

  • Project: Prairie du Sac Dam Mobile Gate Hoists (2 ea.) Replacement
  • Lemke Industrial Machine LLC: Provided two (2) Torque Tube design mobile gate hoists with 24,000 lbs. lift capacity at 8 fpm. The hoist cart is self-powered with operator controlled variable speed from 0 to 200 fpm.
View Other Projects

Lemke Industrial Machine has been a reliable partner in many of our hydro projects over the last decade, plus. They have a very detail orientated approach to engineering, fabrication, testing, and project management which leads to great results! They have excellent follow through on any piece of equipment they supply; quickly and thoroughly addressing any issues that come up during commissioning and providing support over the life of the equipment. They have also offered their services in troubleshooting equipment they did not originally supply! We appreciate them very much as an ongoing partner.

Sandy Froeschner PE, Senior Engineer, Generation Engineering, Alliant Energy

REACH US AT

715.842.3221

143454 County Hwy NN
Marathon, WI 54448

REACH US AT

715.842.3221

ADDRESS

143454 County Hwy NN
Marathon, WI 54448

Why Choose Lemke?